Home Page

About Page

Photo Page

What's New Page

Contact Page

Favorite Links

THIS WEB PAGE PERSONALLY DESIGNED BY THE SURVEYOR " SANJAY KUMAR SHAW" SO, FOR ANY ERROR/PROBLEM PLEASE ADVICE US FOR ENHANCEMENT
THE HOME PAGE AND THE CONTACT PAGE HAVE BEEN PREPARED TEMPORARYLY WHICH WILL BE MODIFIED ON LETER ON
Ref No:NIC/MG/SKS/M/1/10/99/2000 Date:22.10.99

REGISTERRED WITH A/D
Without prejudice
M/S Bengal Service,
2/2, Tiljala Road,
Calcutta - 700 046.

RE Claim no : 305/31/02/07/198/99
Policy No : 305/31/02/11/3582/98
Vehicle no : WB 02 J 1998
Date of loss : 01.10.99
On A/C Of : M/S B.G. Overseas Corpn

Dear sir,
With reference herein above, undersigned visited at your place on 15.10.99 at about 10.55 a.m. and the captioned vehicle was found and initial inspection of the vehicle was carried out.

In this connection, you are requested to let the undersigned know about date of complete post dismantling inspection with prior notice and appointment and along with the Hyundai man hour schedule book for the job in operation and requisition list of the two component paint of the said repairing job to enable the undersigned to assess the loss with proper indemnification.
This is to inform you that your submitted painting schedule issued by your principal ( Hyundai) is containing only the prices without highlighting the basis and requisition material list /amt./qty for each and individual parts/portion of the body and complete vehicle. Since, your esteem concern is a dealer point Hyundai, we are excepting all the data from your desk. But you were found unable to clarify the same to undersigned and undersigned were compelled to issue ex party report during our last four survey job.

Apart from this undersigned have shown you the material inventory list for the painting of maruti Zen /esteem car for 2 K painting, issued by Due Pont, which is too low as compare to your schedule.

Your earliest reciprocation will be highly appreciated.


Thanking you


Yours Faithfully




( SANJAY KUMAR SHAW )
Surveyor/Loss Assessor
CC TO: The United India Insurance Co. Ltd,
Divisional Office V, 25, Brabourn Road,
Calcutta-1…………. For information.

M/S B.G. Overseas Corporation,
6, Wood Street, Cal - 20
HMI East Regional Office,
Through Fax for information
HMI H.Q Through E Mail for information



Ref No : UI/E//10/A/20-21 Date: 06.05.2000
Through RegdA/Dfax
WITHOUT PRE JUDICE
To,
Rajesh Karmakar
63/1, Nabin Senapati Lane, Howrah - 711101
Our previous letter Ref No : nil,
Dated :
RE : Claim No : 305/30-Jul/2000
Policy No : 305/11/6070/99/1999
Item Loss : WB 12 A 2555
Date of Loss : 23.04.2000
On A/C of :
Dear Sir,
Acknowledge to receipt your fax letter no nil dated: nil received on 03.05.2000 at about 9.24 a.m. and content were found consistant fot the damages of right side; Fr side & Left side other than the xtra fitment of front cross guard ( which is strictly banned by the MVD and MUL service manual) and may be caused to unexpected damages.Pertaing to damages of rear side i.e. rear bumper, which have been reportedly damaged while your vehicle was lifted on chain cranr from rear side. thus rear bumper is not payable under the purview of policy condition , as you are liable to get towing and protection charges on presentation bill/receipt is please to be noted. During the period of inspection, undersigned observed that the yoke of the propellor shaft have been partially came out from the transmission case, which resultanly causes to locking of rear transmission link centrifugal movement. but partal embrassing of the yoke were found not clear to undersigned which has caused without effecting the adjacent fittings and spareparts & body portion, is please to be noted. What so ever please find here the undersigned assessed opinion on the basis of reported overhead/profit/man head of your repairer.If there will any differences of asking labour charges by your repairer. Please advice your repairer to do fax immidiately.
Since, effect on the link transmission assy were not able to actuate for consistancy of the captioned claim, undersigned is unable to do recommend the assessment amont for the same till date.
..survey reportassessmentUI-E-2555.xls

Reported Overhead Monthly 70,000.00
Reported profit Monthly 30,000.00
Reported man head 22.00
Calculated man hour 22.73


opening/fitting cutting/welding Repairing Paint
Item timming amt timming labout amt material T.Amt Timming amt amt
Fr portion damage assessment
W/S Glass 0.9 20.45
Instrument panel 1.7 38.64
Hinge RF/LF Door 1.4 31.82
Fr Bumper 0.5 11.36
Fr Grill 0.5 11.36
Stg Wheel 0.3 6.82
Combn Switch 0.3 6.82
STg Column assy 0.8 18.18
Stg Box Joint 0.4 9.09
Wiper Motor 0.6 13.64
Wiper Link 0.5 11.36
Wiper arm & Blade 0.8 18.18
Washer Tank assy 1.3 29.55
H/lamp 0.8 18.18
Fr Harness 3.6 81.82
Horn Assy 0.6 13.64
Control Paddle 2.1 47.73
Fr Seat 0.6 13.64
Stg member 0.8 18.18
Stg box 0.9 20.45
Fr Show panel 3.5 79.55 113.75 193.30 550.00
Panel Floor front 3.6 81.82 113.00 194.82 300.00
Fr panel inner/outer lower RH/LH 3.8 86.36 51.50 137.86 160.00
Net labour assessment for Fr 1,941.27

Assessment for right side
RF door 0.7 15.909 102.25 102.25 3.5 79.55 450.00
Panel Sill outer CTR RH 0.5 11.364 2.2 50.00 126.75 176.75 1 22.73 220.00
Panel RR Door 1.3 29.545 100.00 100.00 2.5 56.82 450.00
RR Qtr glass Trim 1.2 27.273
RR Comblamp 0.4 9.0909
Rr Bumper 0.4 9.0909
Rr Qtr Panel 100.00 100.00 2.6 59.09 425.00
Net labour assessment for right side 2,126.27

Assessment for left side
LF Door 0.7 15.909 100.00 100.00 3.5 79.55 450.00
LH Centre Piller outer 0.5 11.364 2.2 50.00 126.75 176.75 1 0 220.00
LR door 1.3 29.545 100.00 100.00 2.5 0 450.00
Net labour assessment 1,553.57
5,621.11
Spare Parts at L.P
For front portion damages
Panel Fr Show W/S Glass( Laminated), Weather Strip W/S Glass; Grill H/lamp RH; Grill H/lamp LH; Fr Bumper;
Lamp assy Fr Comb RH; Lamp assy Fr Comb LH; Panel Instrument main; Bulb 2 pcs; Emblem omini; Bkt Control paddle;
Wiper blade 2 pcs; Combn switch; Cover stg 1 pcs; Link assy wiper; Wiper arm 2 pcs; H/lamp bulb 2 pcs; only.
For damages rear portion
Rear bumper
Undersigned have not received any reply from the repairer/ Maruti Udyog Ltd, ERO Cal and your end also till date.
Your's earliest reciprocation will be highly appriciated otherwise undersigned will be compelled to submit an exparti report to bring a speculation that the above assessment is without pre judice for proper imdemnification, is please to be noted.
Thanking you.
Yours Faithfully



(SANJAY KUMAR SHAW)
SURVEYOR/LOSS ASSESOR
C.C. To United India Insurance Co. Ltd, D.O. V
Greewal Auto Service,97/1 Foreshore Road, Shibpur, Howrah -2
National Insurance Co. Ltd, H.O., Kind Attn: Manager Technical.
Dear Sir, reapirer were found very rigid to do any corresspondance with the above assessment and insured is suffering a lot. The problem arises only due to NON ENLISTMENT OF REPAIRER IN THE LIST OF INSURANCE COMPANY OR BY OTHER MEANS.
Insurance Regulatory Authority, Gate No 3, Jivan ara Building, 5, Parliament Street, ND - 1, Please find here above, the assessment sheet have been arrived on the basis of repairer's reported overhead ( Repairer's status MUL/ Category C)/man hour and maruti FRT Manual. PLEASE, confirm us, wheather a surveyor will do assessment on the basis of the database calculation for proper indemnification with consideration of availability of the materials/ skill man power resources e.t.c or on the basis of market acceptance woithout any calculation of statistical database oe as per the insured's manufacturer recommended schedule.

SANJAY KUMAR SHAW (SURVEYOR LOSS ASSESSOR)
OFFICE:23,Strand Road,2nd Floor, Calcutta - 700 001
Phone: 91 33 221 1742 (o), Tele Fax: 91 33 221 1742

Address of communication:
128, D.D. Road, G-3, Calcutta - 700 048.
Phone cum Tele fax: 91 33 521 6062(O)

Calcutta Suburban Office:
26, G.T. Road, Champdany, P.O. Baidyabati,
Dist: Hooghly, PIN: 712222
Phone: 632 2684


for any information and advice Mail me
Other Web site http://www.surveyor.8k.com
Other E Mail : surveyors60@hotmail.com